Session checkpoint
Symlink location: ~/.claude/skills/issues-beads-checkpoint/SKILL.md
Slash command: /issues:beads-checkpoint
Action prompt for session wind-down. Capture learnings into the issue graph before context is lost.
Purpose: End of session status updates and handoff preparation.
If you need to refactor the issue graph structure during checkpoint (e.g., split epics, merge issues, restructure dependencies), use /issues:beads-evolve first, then complete the checkpoint workflow.
Run wind-down diagnostics
Execute these commands now:
# Current state (compare to session start)
bd status
# What changed this session
bd activity
# Epic progress change
bd epic status
# Health check before commit
bd dep cycles
The activity feed shows what happened this session. Epic status shows progress advancement. Cycle check prevents committing a corrupted graph.
For structured session summary:
# Create repo-specific temp file
REPO=$(basename "$(git rev-parse --show-toplevel)")
SUMMARY=$(mktemp "/tmp/bd-${REPO}-checkpoint.XXXXXX.json")
bv --robot-triage > "$SUMMARY"
# Session-relevant extractions
jq '.quick_ref' "$SUMMARY" # current counts
jq '.project_health.graph_metrics' "$SUMMARY" # health metrics
jq '.stale_alerts' "$SUMMARY" # attention needed
# Clean up when done
rm "$SUMMARY"
Scale-aware session summary
Determine session scope by counting issues touched:
# Count issues modified this session (from activity feed)
bd activity | grep -E "^[→✓✗⊘+]" | wc -l
Tailor summary depth to session scope:
Small sessions (1-3 issues touched):
- Full detail on each change with complete before/after state
- Include full descriptions for modified issues
- Show complete dependency changes with rationale
Medium sessions (4-10 issues touched):
- Summary table of changes by category:
- Closed: list with brief completion notes
- Updated: list with what changed
- Created: list with traceability
- Dependencies: count of additions/removals
- Highlight key closures and discoveries
Large sessions (10+ issues touched):
- Epic-level aggregation of changes
- Statistics only: "8 closed, 3 created, 12 dependencies modified"
- Only highlight critical changes:
- Blockers discovered during work
- Scope corrections that affect downstream
- Priority changes based on new understanding
- Per-epic progress deltas: "Domain layer: 42% → 58% (+5 closed)"
Determine scope tier:
# Rough session scope from recent activity
bd activity --limit 50 | head -20
Graph health verification
Before committing, verify graph integrity:
# Must be zero — cycles corrupt the graph
bd dep cycles
# Check for structural issues
bd lint
# Confirm ready queue makes sense
bd ready | head -5
If cycles are detected:
# Identify the cycle
bd dep cycles --verbose
# Break the cycle by removing the inappropriate dependency
bd dep remove <upstream> <downstream>
If lint issues are found, resolve before committing. This prevents corrupting the graph during wind-down.
Reflect
Consider what was learned this session that the issue graph does not yet reflect.
Scope changes
- Was the work larger or smaller than the issue described?
- Did implementation reveal complexity not anticipated?
- Should the issue description be updated to reflect actual scope?
Discovered work
- Were bugs found during implementation?
- Was technical debt identified that should be tracked?
- Are there follow-up enhancements worth capturing?
Dependency corrections
- Were any listed blockers not actually blocking?
- Were hidden prerequisites discovered?
- Can work that was assumed sequential actually proceed in parallel?
Priority shifts
- Did this work reveal that other issues are more/less critical than assigned?
- Were any P3 items actually critical blockers?
- Were any P1 items actually low-impact?
Priority recalibration
If reflection revealed priority mismatches, update before committing:
# Issue proved more critical than marked
bd update <id> --priority 1
# Issue proved less critical than marked
bd update <id> --priority 3
# Add context for the change
bd comments add <id> "Priority adjusted: discovered this blocks X during implementation"
Common recalibration patterns:
- Infrastructure issues often prove higher priority once downstream work begins
- Optional enhancements sometimes prove necessary for core functionality
- Assumed blockers sometimes prove to have workarounds
Capture
For each learning identified above, execute the appropriate update.
Scope/understanding changes:
bd update <issue-id> --description "Revised: <what changed and why>"
Discovered issues:
# Create with traceability to current work
bd create "<title>" -t <bug|task|feature> -p <priority>
bd dep add <new-id> <current-issue-id> --type discovered-from
Dependency corrections:
# Remove false dependencies
bd dep remove <not-actually-blocking> <issue-id>
# Add discovered dependencies
bd dep add <actual-blocker> <issue-id>
Progress state (if work incomplete):
bd comments add <issue-id> "Checkpoint: <summary of state>"
Completed work:
# Option A: Close with reason
bd close <issue-id> --reason "Implemented in commit $(git rev-parse --short HEAD). <any notable learnings>"
# Option B: Close and see what was unblocked
bd close <issue-id> --reason "Implemented in..." --suggest-next
# Option C: Separate close and comment
bd close <issue-id>
bd comments add <issue-id> "Implemented in commit $(git rev-parse --short HEAD). <learnings>"
Unblock chain visibility
When closing issues, show the cascade effect:
# See what completing this unblocked
bd close <id> --reason "..." --suggest-next
# Show full unblock chain
bd dep tree <closed-id> --direction up
Extract structured unblock data:
# Count direct and transitive unblocks
bd dep tree <closed-id> --direction up --json | jq '{
direct: [.children[] | .id],
direct_count: [.children[]] | length,
total_downstream: [.. | .id? // empty] | unique | length
}'
Present the cascade:
- "Closing nix-50f.2 unblocked 3 issues (nix-50f.1, nix-l2a.2, nix-l2a.5)"
- "These 3 issues unblock 7 more downstream"
- "Total downstream impact: 10 issues now closer to ready"
This demonstrates session impact and helps users understand graph flow.
Epic impact aggregation
For medium and large sessions, show epic-level progress change:
# Epic progress overview
bd epic status
Present as progress deltas:
- "Domain layer: 42% → 58% (closed 5 issues)"
- "Infrastructure: 20% → 35% (closed 3 issues, created 2)"
- "Frontend: unchanged (0 issues touched)"
For large sessions, aggregate by epic rather than listing individual issues:
# Extract issues by epic from activity
bd activity | grep "✓" | while read line; do
id=$(echo "$line" | awk '{print $2}')
bd show "$id" --short
done
This provides high-level progress visibility without overwhelming detail.
Handoff
Prepare for the next session to pick up cleanly.
If work is complete:
# Option A: Close and immediately see what was unblocked
bd close <issue-id> --reason "Implemented in..." --suggest-next
# Option B: Manual review of dependencies
bd dep tree <completed-id> --direction up
# Check if any epics are ready for human review (epic closure is human-only)
bd epic close-eligible --dry-run
Review unblocked issues — do their descriptions need updating given what was learned?
If work is incomplete:
Leave a checkpoint comment on the in-progress issue:
bd comments add <issue-id> "$(cat <<'EOF'
Checkpoint: <date/session identifier>
Done:
- <what was accomplished>
Remaining:
- <what still needs to be done>
Learnings:
- <key insights that affected approach>
Suggested next steps:
- <where to pick up>
EOF
)"
Note: Use bd update <id> --claim to atomically claim an issue when resuming work (sets assignee + status to in_progress, fails if already claimed).
Narrative handoff synthesis
Produce a prose summary for the next session:
Session Summary:
Completed:
- <issue-id>: <brief description of what was implemented>
- <issue-id>: <brief description>
Discovered:
- <issue-id>: <why this was created, what triggered discovery>
Learned:
- <key insight that changed understanding>
- <assumption that proved incorrect>
Next:
- Recommended starting point: <issue-id> (<why this is the logical next step>)
- Alternative entry points: <issue-id>, <issue-id>
Warnings:
- <blockers discovered but not resolved>
- <scope risks identified>
- <concerns that may affect future work>
This mirrors beads-orient's synthesis section but for session end.
The next session can use this summary plus /issues:beads-orient to quickly resume.
Final commit
Execute the commit sequence:
# Validate beads database integrity
bd hooks run pre-commit
# Ensure DB file is staged
git add .beads/issues.jsonl
# Commit with meaningful message
git commit -m "chore(issues): <describe what changed>"
The commit message should explain WHAT changed in the issue graph, not just generic sync messages.
Small sessions: Name specific issues
- "chore(issues): close bd-xyz auth implementation, discover bd-abc blocker"
Medium sessions: Summarize by category
- "chore(issues): close 5 domain issues, update infrastructure dependencies"
Large sessions: Epic-level summary
- "chore(issues): advance domain epic to 58%, infrastructure sprint complete"
Verify next work is discoverable
Before ending the session, ensure the next agent can pick up cleanly via /issues:beads-orient.
# Quick check of top recommendation
bv --robot-triage | jq '.quick_ref'
# Or minimal: just the top pick
bv --robot-next
# Review its description
bd show <top-recommendation-id>
If the description is stale or incomplete based on what was learned this session:
bd update <top-recommendation-id> --description "Updated: <incorporate session learnings that affect this issue>"
This applies whether work was completed or interrupted:
- Completed milestone: Next issue's description should reflect any context discovered during the completed work
- Interrupted work: Current issue should have checkpoint comment, AND next logical issue should be accurate
The issue graph becomes the handoff — no complex session notes needed.
When descriptions are accurate, /issues:beads-orient in the next session will find actionable, up-to-date work.
Summary for user
Provide the user a summary scaled to session scope.
Small sessions: Full detail
- Issues closed:
- Issues updated:
- Issues created:
- Dependencies modified:
- Unblock cascade:
Medium sessions: Category summary
- Closed: X issues ()
- Updated: Y issues
- Created: Z issues
- Dependencies: N additions, M removals
- Epic progress:
- Next session:
Large sessions: Executive summary
- Statistics: "8 closed, 3 created, 12 dependencies modified"
- Epic progress:
- Key changes:
- Next session:
The next session can run /issues:beads-orient to see the updated project state.